Light Rail Transit System, LRT3

Construction of two major bridges at South Hills Junction, reconstruction of existing parking facilities including excavation, grading, drainage and concrete paving as well as electrical and signal modification at the tie in of the existing line. Construction of civil work for the trackway for two miles of track that parallels Route 88; including excavation, grading and drainage, seven soldier pile retaining walls, three mesa block retaining walls, two cast in place retaining walls, catenary foundations and conduit, one bridge structure and the structural components of four LRT passenger stations.

Light Rail Transit System, LRT3 photo

  • ClientPort Authority of Allegheny County
  • LocationPittsburgh, PA
  • Value$54,522,036
  • Highlights
    • Two major bridge structures at South Hills Junction
    • Parking facilities
    • Two miles of trackway
    • Seven soldier pile retaining walls
    • Three Mesa block retaining walls
    • Two cast in place retaining walls
    • Concrete paving
    • Station Architectural Finishes