Our contract was to demolish Consol's Bailey Mine thermal dryers, including stainless steel stacks and five (5) over head conveyors. Also, several items needed to be salvaged for Consol; such as electric motors, shakers, fan equipment and hoist. The dryers were set cut and dropped in place. Stacks were disassembled using a 250 ton truck crane. The sections were prepared by burning and lowered using a 250 ton truck crane. The conveyors were also dissassembled, using the same procedures as the stacks. After the structures were razed, all concrete foundations and footers were removed. The site was then rough graded.

Penn Hills High School photo

  • ClientMassaro Corporationy
  • LocationPenn Hills, PA
  • Value$1,575,000
  • Highlights
    • Demolition of one (1) multi-level structures, 250,000 sf
    • Removal of basement walls, foundations, utility tunnels, and slabs
    • Removal of 80 foot stack
    • Crushed 10,000 tons of concrete materials for on-site fill
    • Recycled 2,000 tons of metal materials, and 10,000 tons of concrete